Sulayman Bowles
Back to writing

Texas infrastructure

Texas toll-road ownership: map, tables and source data

TxDOT runs SH 130’s first four segments, and a private concession runs the last two. Search a Texas toll road for its operator, its billing, and, where sourced, its owner.

Monochrome generative point study “Soft Twins,” a mathematical form rendered in black and white.

SH 130 changes financing models after Segment 4: Segments 1–4 belong to TxDOT’s public system, while Segments 5–6 operate under a state concession. Search a named road to see who runs it, who bills you, and, where a source names it, the public owner. Each segment links its sources. The map points mark regions, so use a navigation app for directions.

SH 288 has another split: TxDOT’s Harris County lanes returned to public control in 2024, while Brazoria County administers its own section. The TxDOT operator list, SH 130 agreement, and Brazoria history supply the records.

Method & limits

An October 26, 2026 research edition of selected named facilities from TxDOT’s operator list, with sourced concession details. The map uses approximate regional locators, not road alignments or property boundaries. Missing title and investor percentages remain missing.

The lookup filters the same facility records

Search by the road name, route abbreviation, public authority or operator. Region and control filters combine with the search. Selecting a map region filters the same records; selecting a result opens its authority, billing, concession, and source fields. Clear the filters to restore the full edition.

A public authority’s name identifies the responsible body in the official list. The public-title field is populated only where this edition has an explicit source for roadway title; a blank does not imply private land. The original ownership investigation explains the legal and financial layers in greater detail.

October 26, 2026 · 44 named facility records

The name on the bill is only one layer

Select a region or search a road. Public authority, operating company and billing service stay in separate fields.

44 of 44 records

Texas toll ownership by regionSelect one of five approximate regional locators to filter the same road records. This map does not show road alignments or property boundaries.17DFW12Austin13Houston1Tyler1RGV
Regional context points, shared by rows in the region. The TxDOT outline supplies geographic context; no road or property geometry is shown.

Public operation

Dallas North Tollway (DNT)

NTTA facility

Public authority
North Texas Tollway Authority (NTTA)
Operator
North Texas Tollway Authority (NTTA)
Billing service
North Texas Tollway Authority (NTTA)
Toll-revenue claim
North Texas Tollway System, subject to its financing pledges
Roadway / System title
NTTA / public System assets

Public NTTA System. Do not confuse NTTA with North Tarrant Express (NTE).

Checked 2026-10-26 · Record ntta-dnt

Missing title and investor fields are retained as missing. Records in one authority can share the same financing pledge. Download CSV, JSON or GeoJSON with the field dictionary and primary sources.

Ownership map

Table 1. Texas toll-road ownership map
Facility or systemRegionPhysical ownerToll-revenue ownerConcessionaireCurrent direct equity ownersOwnership percentagesUltimate ownersConcession expirationCurrent statusEvidence date
North Texas Tollway System (NTTA)DFWNTTA; Sam Rayburn Tollway is a right-to-use state assetNTTA systemNoneNot applicablePublic authorityNo shareholdersNone; SRT use right ends 2058Operating public, system-pledged networkFY ended Dec. 31, 2025; board data 2026
Harris County Toll Road AuthorityHoustonHarris CountyHCTRA enterprise fundNoneNot applicableCounty enterpriseHarris CountyNoneOperating public systemFY ended Sept. 30, 2025
Central Texas Regional Mobility Authority systemAustinCTRMA / applicable public right-of-way ownersCTRMA system; MoPac Express is non-systemNoneNot applicableIndependent public authorityNo shareholdersNoneOperating; system and non-system pledges reported apartFY ended June 30, 2025
Central Texas Turnpike SystemAustinState of Texas / TxDOTCTTSNoneNot applicableState systemState of TexasNone; final debt maturity 2042Operating public systemFY ended Aug. 31, 2025
Grand Parkway System / GPTCHouston regionState of Texas / TxDOTGrand Parkway Transportation Corporation systemNoneNot applicableTxDOT component corporationState public structureNone; final debt maturity 2053Operating public, system-pledged networkFY ended Aug. 31, 2025
TxDOT I-35E managed lanesDFWState of Texas / TxDOTTxDOT projectNoneNot applicableState projectState of TexasNone; final debt maturity 2052Operating publiclyFY ended Aug. 31, 2025
TxDOT SH 249 SystemHouston / Montgomery–GrimesState of Texas / TxDOTTxDOT systemNoneNot applicableState systemState of TexasNone; final debt maturity 2057Operating publiclyFY ended Aug. 31, 2025
Fort Bend County Toll Road AuthorityFort Bend CountyFort Bend County public structureFBCTRANoneNot applicableCounty component unitFort Bend CountyNoneOperating public systemFY ended Sept. 30, 2025
Fort Bend Grand Parkway Toll Road Authority, Segment DFort Bend CountyState/TxDOT right-of-way; authority right of useFBGPTRANoneNot applicableCounty component unitFort Bend CountyNo private concessionOperating public facilityFY ended Sept. 30, 2025
North Tarrant ExpressDFWState of Texas / TxDOTNTE Mobility Partners, LLC, subject to sharing and debtNTE Mobility Partners, LLCFerrovial/Cintra affiliate; Meridiam affiliate62.97%; 37.03%Ferrovial N.V.; Meridiam-managed funds2061Operating private concession on public roadMay 2026 — confirmed percentages
LBJ ExpressDFWState of Texas / TxDOTLBJ Infrastructure Group, LLC, subject to sharing and debtLBJ Infrastructure Group, LLCFerrovial/Cintra affiliate; APG affiliate; Meridiam affiliate54.60%; 28.33%; 17.07%Ferrovial N.V.; APG-managed pension capital; Meridiam-managed funds2061Operating private concession on public roadMay 2026 — confirmed percentages
NTE 35WDFWState of Texas / TxDOTNTE Mobility Partners Segments 3, LLC, subject to sharing and debtNTE Mobility Partners Segments 3, LLCFerrovial/Cintra affiliate; APG affiliate; Meridiam affiliate53.67%; 28.84%; 17.49%Ferrovial N.V.; APG-managed pension capital; Meridiam-managed funds2061Operating private concession on public roadMay 2026 — confirmed percentages
SH 130 Segments 5–6Austin–San Antonio corridorState of Texas / TxDOTSH 130 Concession Company, after sharing and debtSH 130 Concession Company, LLCSVP-controlled vehicle; U.S. DOT / Build America interestApprox. 65% SVP; 32% U.S. DOT; 4% other (2Q 2024; rounded)Strategic Value Partners funds and investors; U.S. federal government2062Operating post-bankruptcy concessionExact percentages 2Q 2024; majority/minority structure reconfirmed July 2026
Former SH 288 managed-lane concessionHoustonState of Texas / TxDOTTexas Transportation Finance Corporation / public structureNone since Oct. 8, 2024NonePublicState of Texas structurePrivate term ended; original expiry March 2068Publicly controlled after termination; HCTRA supports billingJuly 2026; FY2025 financial reporting

Ownership labels refer to the economic and legal layer stated in each column. They do not convert a project-company percentage into ownership of state land. Sources: S1, S6, S10–S22. Ferrovial’s April 30, 2026 announcement records its conversion from SE to N.V. with the same legal personality and rights.

Private concession comparison

Table 2. Private-concession comparison
ProjectOriginal project costOpening dateConcession length / remaining termToll structureMajor debt sourcesCurrent ownershipFinancial turning pointCurrent investment relevance
SH 130 Segments 5–6$1.328bnOct./Nov. 201250 years to 2062; about 36 years remainScheduled tolls; annual escalation linked to nominal Texas GSP per capita; vehicle classesOriginally $685.8m senior banks and $430m TIFIA; $260m new financing disclosed at emergence; current debt unavailableSVP-controlled majority; U.S. DOT minority; dated estimate 65% / 32% / 4% other (2Q 2024; rounded)2016 Chapter 11; 2017 debt-to-equity restructuringPossible concession-company secondary, continuation vehicle, or refinancing; federal stake and limited disclosure complicate access
North Tarrant Express$2.122bnOct. 4, 201452 years, 2009–2061; about 35 years remainDynamic, five-minute repricing; CPI-linked soft cap and congestion exceptionPABs, TIFIA at inception, public funds; $1.600bn debt at Dec. 2025Ferrovial 62.97%; Meridiam 37.03%Traffic maturation and mandatory capacity expansionExposure through sponsor equity, fund secondary, or project bonds; strong cash flow offset by capex and sharing
LBJ Express$2.645bnFully open Sept. 201552 years, 2009–2061; about 35 years remainDynamic managed lanes; HOV discounts; CPI-linked frameworkPABs and TIFIA; $2.038bn debt at Dec. 2025Ferrovial 54.60%; APG 28.33%; Meridiam 17.07%Successful ramp-up but high leverage; Wishbone expansionPotential sponsor or pension secondary and project debt; main constraint is roughly 10.1x net debt/EBITDA
NTE 35WAbout $2.327bn across 3A/3B/3C packagesStages in 2016, 2018, and 20232013–2061; about 35 years remainDynamic managed lanes with speed target and sharing bandsPABs, TIFIA, bank facilities; $1.598bn debt at Dec. 2025Ferrovial 53.67%; APG 28.84%; Meridiam 17.49%Segment additions, rapid growth, and rising revenue sharingLarge operating scale and sponsor/fund routes; value constrained by sharing, leverage, and future corridor obligations
Former SH 288 concession$1.0635bnNov. 202052 years to March 2068; private term ended with 43.4 years leftDynamic; annual minimum and cap linked to CPI and Texas nominal GSP per capita$298.6m PABs and $357m TIFIA plus capitalized interest; repaid at terminationPublic since Oct. 8, 2024; immediately prior: Abertis 56.76%, ACS 43.24%$1.7317bn TxDOT terminationNo private concession equity remains; possible exposure through TTFC bonds or operating procurements

Remaining terms are approximate at the July 11, 2026 research cutoff. Costs may combine differently scoped construction packages; NTE 35W is explicitly aggregated across 3A, 3B, and 3C. Sources: S3, S6–S13.

Public and private delivery

Table 3. Public versus private toll-road economics
IssuePublic toll systemPrivate concession
Physical asset ownerPublic authority, county, or stateUsually still the state or public sponsor
Toll-revenue recipientPublic enterprise or pledged systemProject company for a finite term, after contractual sharing
Capital providerRevenue-bond investors; sometimes tax-supported debt and public fundsEquity sponsors, PAB investors, banks, TIFIA, and public contributions
Cost of debtOften tax-exempt and lower-returnCan use tax-exempt PABs and TIFIA, but typically carries more structural risk
Equity requirementNo private equity return; retained net revenue acts as public capitalExplicit at-risk equity with a higher required return
Traffic riskPooled across system where revenues are cross-pledgedUsually concentrated in the project company
Toll-setting flexibilityBoard or agency controlled; often more directly politicalContract formula may permit automatic or dynamic changes, still politically exposed
Financial transparencyAudited public statements and bond disclosure; stand-alone road data may be limitedContract is often public; operating financials, cap tables, and debt can be selective
Ability to distribute cashNo dividends; cash retained, transferred for authorized purposes, or used on networkDistributions after O&M, capex, debt tests, reserves, sharing, and tax
Concession expiryNoneToll and operating rights expire; handback and any supported residual claims follow their own contractual terms
Bankruptcy consequencesDebt restructuring affects public credit and system financeEquity can be wiped out and debt converted while the road stays open
Incentive to maximize revenueBalanced against policy, network, and affordability goalsDirect, but constrained by contract, demand elasticity, and political response

Valuation questions

Table 4. What determines toll-road equity value?
DriverDirectional effect on equityMechanismConstraint or nonlinearity
Traffic growthPositiveMore paid transactions spread fixed costsCan trigger revenue sharing, capacity capex, or congestion controls
Toll growthPositive if demand holdsRaises revenue per tripElasticity and political resistance can reduce volume
InflationOften positive for revenueIndexed tolls can riseO&M, maintenance, and interest costs may also rise
Operating costsNegativeReduce cash before debtCollection-risk allocation can shift costs to a public entity
Major maintenanceNegative near termConsumes cash or requires new debtDeferral can damage handback condition and long-term value
LeverageRaises upside and downsideSmaller equity base magnifies value changesCovenants can stop distributions before insolvency
Interest ratesUsually negative when higherIncrease refinancing cost and discount rateFixed-rate debt and inflation-linked tolls provide partial protection
Remaining concession lifePositive when longerAdds years of distributable cash flowNo continuing toll right after expiry without an extension; any supported residual claim needs its own valuation
Political interventionUsually negative for private equityCan constrain rates, change exemptions, or trigger buyoutA contractual termination payment may protect creditors or create value
Competing road capacityUsually negativeReduces time savings and paid demandConstruction disruption can help toll traffic temporarily

Concession dates

Major Texas toll concessions and current termination status
ProjectPublic titleholderPrivate concession endCurrent private status
North Tarrant ExpressTxDOT / State of Texas2061Active
LBJ ExpressTxDOT / State of Texas2061Active
NTE 35WTxDOT / State of Texas2061Active
SH 130 Segments 5–6TxDOT / State of Texas2062Active
SH 288 managed lanesTxDOT / State of TexasOriginal 2068Terminated in 2024

Road names and collection services

Identify the authority, road project, and payment account
Name encounteredWhat it identifiesWhere to check control
NTTAA public regional authority. Dallas North Tollway and President George Bush Turnpike are NTTA System facilities.NTTA’s board page for governance; its road list for the exact facility.
NTE, LBJ Express or NTE 35WManaged-lane projects with their own developer/operators; NTE is not NTTA.The operator list identifies LBJ Infrastructure Group, NTE Mobility Partners, and NTE Segment 3’s own operator.
TollTag or ZipCashNTTA’s account or invoice interface, which also handles travel on other operators’ lanes.Read the facility named in the trip record, then look up that road’s operator.
TxTagA different tag from NTTA’s TollTag. Accounts transferred to HCTRA can continue using their existing TxTag.Use TxDOT’s current TxTag/HCTRA guidance; do not infer road ownership from the tag or bill.

Checked October 23, 2026 against NTTA’s current board and road/operator pages, Chapter 366 and TxDOT’s tag guidance. This lookup does not revalue concessions, certify every property title or update the article’s financial reporting periods.

A road number can contain several businesses

SH 130 Segments 1–4 belong to TxDOT’s public system. Segments 5–6 are under a state concession whose company reports Strategic Value Partners as majority owner and the federal government as minority owner. The restructuring case dates its historical recoveries.

The SH 288 records identify different projects in Harris County and Brazoria County. The Harris County private agreement was terminated October 8, 2024. A record for the former private concession is not evidence that a private investor still owns those operating rights. Brazoria County’s authority states that its portion remained under county management. TxDOT termination record; BCTRA history.

NTTA and NTE are different entities. The database distinguishes public NTTA roads from private LBJ, NTE, and NTE 35W concession companies, and from TxDOT-operated TEXpress lanes. All can use NTTA billing. For example, a search for “I-35E” should not return the private NTE 35W project as if the interstate suffixes were interchangeable.

The stable ID joins the downloads

The stable record ID is the join key across CSV, JSON, and GeoJSON. Road and segment fields name the facility boundary, rather than treating an entire numbered highway as one business. Authority, operator, and billing agency have their own fields. Control type distinguishes public operation, private concession, and a return to public control.

Public-title, private-business ownership, and concession-end fields require their own evidence. Null means unavailable or inapplicable, as explained by the record note; it never means zero ownership. Source IDs resolve to the source list in JSON and the data dictionary. The checked-on date describes the source review, not the date the road was built or the concession signed.

The GeoJSON points put facilities into regional context using shared approximate locators and the site’s existing TxDOT state outline, so several records may occupy one point even while their road segments, authorities, and contractual rights remain different in the accompanying fields. Geometry orients the directory. It doesn’t certify a deed, parcel, road alignment, or maintenance limit.

A small field dictionary
Field groupUse
id, road, segmentIdentify and join the named facility record
authority, operator, billing_agencyKeep public responsibility, operation and payment service separate
roadway_title, private_business_owners, concession_end_yearRead the documented roadway title and private concession rights
control_type, regionFilter the directory and map
source_ids, checked_on, notesFollow sources with their qualifications
locator coordinates and precisionRegional context only; not road geometry

The download includes the complete field descriptions and the primary source URLs.

The edition covers selected named facilities

The map covers roads in TxDOT’s statewide operator table across Dallas–Fort Worth, Central Texas, Greater Houston, East Texas, and the Rio Grande Valley. It is a named-road lookup, with facilities sharing a system sometimes drawing on the same financing pledge. Adding their records as independent revenue enterprises would count that pledge more than once.

For a changed bill or newly opened segment, the linked operator and agency pages identify the current responsible service. The executed agreement and amendments govern a concession transfer or termination. A contractor’s renamed business still needs the ownership documents behind it.

I would use the map to locate the right entity, then follow the agreement for the specific segment. Public ownership, toll collection, and a private concession can coexist; the answer becomes useful when it tells me who can act on the bill or obligation in front of me.

For the governing entity behind a bill, read who owns NTTA. The foreign-investment guide separates company control and investor nationality; the US ownership comparison covers structures outside Texas.

Sources

  1. TxDOT, SH 288 Managed Lanes: executed agreements and termination page

    (primary; current through 2026). Documents CDA execution, October 8, 2024 termination, reversion of control, and TTFC authorization.

  2. Texas Transportation Commission, July 30, 2024 minutes and July 31, 2025 minute orderAdditional source 2

    (primary). Documents termination-for-convenience authority, the exact $1,731,730,721 payment, and State Highway Fund loan.

  3. U.S. DOT Build America Bureau, SH 288 project profile

    (primary federal financing record). Project cost, original financing, participants, completion, termination waterfall, and TIFIA repayment.

  4. Abertis, “Puerto Rico and SH288 acquisitions,” October 18, 2023

    (sponsor transaction presentation). Acquisition price and stake, pro forma revenue/EBITDA, gross debt, toll formula, and expiry.

  5. Abertis Infraestructuras annual accounts, 2025

    (audited company filing). SH 288 proceeds received and recorded loss.

  6. Ferrovial Fact Book, May 2026, filed with the SEC

    (current sponsor disclosure). DFW ownership percentages, concession terms, toll framework, 2025 operating figures, debt, distributions, sharing, and expansion.

  7. FHWA project profile, North Tarrant Express

    (primary federal project record). Original cost, financing, term, opening, and original partners.

  8. FHWA project profile, LBJ Express

    (primary federal project record). Original cost, financing, toll collection, term, and opening.

  9. FHWA project profile, NTE 35W

    (primary federal project record). Segment costs, financing, term, construction dates, and dynamic-pricing objective.

  10. TxDOT, SH 130 Segments 5–6 executed agreements

    (primary). Facility concession agreement and supporting documents.

  11. U.S. DOT Build America Bureau, SH 130 Segments 5–6 project profile

    (primary federal financing record). Cost, capital structure, concession, bankruptcy, and U.S. DOT debt and equity recovery.

  12. FHWA, Report on Highway Public-Private Partnership Concessions in the United States, 2016

    (federal analytical report). Original sponsor percentages, revenue-sharing and toll clauses, early forecast shortfall, liquidity stress, and bankruptcy context.

  13. Kentucky Public Pensions Authority, Project Spurs investment recommendation, September 6, 2024

    (public pension investment memorandum; sponsor-derived underlying data). SH 130 65/35 ownership, continuation vehicle, performance, toll escalation, concession term, and restructuring narrative.

  14. SH 130 Concession Company, current company history and FAQs

    (company source, updated through July 2026). State title, majority/minority ownership description, 2025 transactions, improvements, and current operations.

  15. NTTA 2025 Annual Comprehensive Financial Report

    (audited public-system statement). Traffic, revenue, debt, coverage, pledged system, and system assets.

  16. NTTA Board of Directors and system pages

    (primary governance source). Appointment structure and facilities.

  17. Harris County 2025 Annual Comprehensive Financial Report

    (audited county statement). HCTRA revenue, expenses, debt, coverage, cash flow, and transfers.

  18. CTRMA 2025 Annual Comprehensive Financial Report and governance page

    (audited authority statement). System composition, revenue, debt, coverage, and board appointments.

  19. Fort Bend County Toll Road Authority FY2025 Annual Financial Report

    (audited public authority statement). Revenue, debt, governance, and tax-supported obligations.

  20. Fort Bend Grand Parkway Toll Road Authority FY2025 Annual Financial Report

    (audited public authority statement). Right of use, revenue, debt, and county component-unit status.

  21. TxDOT HB 803 Report, FY2025

    (primary state project reporting). Revenue, operating expenses, maintenance, debt service, maturities, SH 288 transition, and non-financed facilities.

  22. TxDOT 2025 Popular Annual Financial Report

    (primary state financial summary). Toll-system net position and SH 288 funding/refunding context.

  23. U.S. Census Bureau, Texas QuickFacts and metropolitan population analyses, 2024–25Additional source 2Additional source 3

    (primary demographic data). State, DFW, Houston, Austin, and exurban growth.

  24. Texas A&M Transportation Institute, 2025 Texas’ 100 Most Congested Road Sections

    (research institute report using 2024 data). Congestion and truck-delay evidence.

  25. TxDOT Texas Freight Mobility Plan and port/freight statisticsAdditional source 2

    (primary state planning data). Freight tonnage, growth outlook, ports, and trade corridors.

  26. TxDOT NTE current executed-agreements indexVerified Oct 16, 2026

    Current source route; read the selected project’s agreement and amendments for actual terms.

  27. HCTRA FY2025 separate financial reportVerified Oct 16, 2026

    Authority-level audited financial report; fiscal year ended September 30, 2025. Supplemental source route, not a new reporting period.

  28. TxDOT: NTE 35W Amended and Restated Facility Agreement and Technical Provisions (official ZIP bundle)Verified Sep 23, 2026

    Access rechecked October 19, 2026. The agreement is available in TxDOT’s official ZIP bundle. The original contract analysis and its September 2026 evidence date are unchanged.

  29. FHWA: DBFOM toll-concession project profilesVerified Sep 23, 2026
  30. FHWA: Toll Facilities in the United StatesVerified Sep 23, 2026
  31. TxDOT: NTE project segments and developersVerified Oct 16, 2026

    Identifies developer for Segments 1/2W and Segment 3A/B/C I-35W project; no merger of project counterparties inferred.

  32. FHWA: public-private partnership agreement libraryVerified Sep 23, 2026
  33. NTTA: financial information and debt-obligation transparencyVerified Sep 23, 2026
  34. NTTA: September 2026 committee notice and authority descriptionVerified Sep 23, 2026
  35. HCTRA: FY2025 Toll Road Authority Enterprise Fund financial statementsVerified Sep 23, 2026
  36. NTTA: public authority, member counties and gubernatorial appointmentVerified Oct 16, 2026

    November2025 issuer release: institutional description and public appointment route. Does not reverify every project title or individual security.

  37. Texas Transportation Code, Chapter 366: public status and board appointment powersVerified Oct 23, 2026

    Sections 366.032 and 366.251 define governmental status and county/governor appointment powers. Checked for the dated governance addition; original financial claims keep their own sources and periods.

  38. NTTA: current facility, TEXpress operator and payment guideVerified Oct 23, 2026

    Lists NTTA facilities and TEXpress lanes by their different operators; identifies private project and TxDOT operators; explains TollTag and ZipCash use. No private equity percentage or individual title search is inferred.

  39. TxDOT: TxTag accounts transferred to HCTRA and retained road responsibilitiesVerified Oct 23, 2026

    The Is TxTag going away FAQ says transferred customers may continue using the tag, directs account service to HCTRA and states that TxDOT keeps road ownership, maintenance and rate-setting responsibilities. This is service guidance, not a title transfer.

  40. Least-Present-Value-of-Revenue Auctions and Highway FranchisingEngel, Fischer and Galetovic / Journal of Political Economy · 2001-10Verified Oct 25, 2026

    2001 model varies concession length with realized demand and a discounted-revenue target. Its assumptions and proposal do not describe the executed Texas fixed-term contracts or imply automatic extension.

  41. Model Toll Concessions Contract Guide, draft addendum, section 11Federal Highway Administration · 2015-01Verified Oct 25, 2026

    January 2015 guide explains lender cure, step-in, substitution, and bankruptcy-continuity provisions. It is a design reference, not a governing Texas agreement or a finding that a particular lender holds each right.

  42. SH 130 original Facility Concession Agreement, sections 2.2 and 4.2TxDOT / SH 130 Concession Company · 2007-03-22Verified Oct 25, 2026

    March 22, 2007 archived agreement; selected clauses checked from the October 21 archive/OCR. Distinguishes no general state debt liability from specific contractual and termination obligations; later amendments need their own review.

  43. TxDOT: toll roads in Texas and operator/billing table

    Primary named-facility and billing-provider baseline, checked October 26, 2026. Selected facilities are expanded to individual records.

  44. TxDOT: SH 130 executed concession agreement and amendments

    State title and finite southern concession; northern road is a different public system.

  45. Brazoria County Toll Road Authority: history

    Distinguishes its county portion from TxDOT’s returned-to-public-control Harris County lanes.

  46. TxDOT: SH 288 executed agreements and termination

    TxDOT’s October 8, 2024 termination of the Harris County private concession.

Supporting material

Read next